Vintage 1967-72 CHEV PICK-UP Spécifications Page 15

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 28
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 14
15
901149 REV D 7/30/14, INST 67-72 CHEVY PICKUP wo AC EVAP KIT PG 15 OF 24
Glove Box
496067
Final Steps
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Install duct hoses as shown in Figure 13, Page 16.
Route A/C wires (12 volt/ground/binary switch/heater valve) through 3/8” grommet as shown in Figure 12,
below.
Install control panel assembly.
Plug the wiring harnesses into the ECU module on the sub case as shown in Figure 13, Page 16 (Wire according
to wiring diagram on Pages 17 and 18).
Install new glove box using OEM screws (See Figure 12a, below).
Install glove box door.
Reinstall all previously removed items, including inner fender.
Fill radiator with at least a 50/50 mixture of approved antifreeze and distilled water. It is the owner's responsibility
to keep the freeze protection at the proper level for the climate in which the vehicle is operated. Failure to follow
antifreeze recommendations will cause heater core to corrode prematurely and possibly burst in A/C mode and/or
freezing weather, voiding your warranty.
Double check all fittings, brackets and belts for tightness.
Vintage Air recommends that all A/C systems be serviced by a certified automotive air conditioning technician.
Evacuate the system for a minimum of 45 minutes prior to charging, and perform a le
ak check prior to servicing.
Charge the system to the capacities stated on Page 4 of this instruction manual.
See Operation of Controls procedures on Page 19.
Figure 12a
Figure 12
Grommet
33144-VUI
Wiring Harness
(12 Volt/Ground/Binary Switch)
Wiring Harness
(Heater Control Valve)
Vue de la page 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 27 28

Commentaires sur ces manuels

Pas de commentaire